Skip to content

90kW Synergy Manager BASE No DC Switch, MC4, DC SPD

Availability:
58 in stock, ready to be shipped
Save 13% Save 13%
Original price £7,126.25
Original price £7,126.25 - Original price £7,126.25
Original price £7,126.25
Current price £6,196.74
£6,196.74 - £6,196.74
Current price £6,196.74
Part No: SE-90000-BASE-FULLInverters - Main Units
  • Rating: 90,000W

Description

Three Phase Synergy Inverter

Main Features:

  • Pre-commissioning feature for automated validation of system components and wiring during the site installation process and prior to grid connection.
  • Easy 2-person installation with lightweight, modular design (each inverter consists of 2 or 3 Synergy Units and one Synergy Manager).
  • Independent operation of each Synergy Unit enables higher uptime and easy serviceability.
  • Built-in thermal sensors detect faulty wiring ensuring enhanced protection and safety.
  • Built-in arc fault protection and optional rapid shutdown (depending on Synergy Manager used)
  • Built-in PID mitigation for maximized system performance.
  • Monitored‚and field-replaceable surge protection devices: integrated RS485 and Type 2 DC SPDs, optional Type 2 AC SPD.

Spec

Parameter Value
Weight 114 kg
Rated Power 90,000 W
Min PPT Voltage 0 V
Max PPT Voltage 0 V
DC Startup Voltage 0 V
DC Shutdown Voltage 0 V
Max Input Voltage 1,000 V
Max DC Power 0 W
Max AC Power (5 Minutes) 82,800 W
Surge AC Power (1 Second) 82,800 W
Max DC Current 0 A
Max DC Inputs 9
Has DC Fuses 0
Connector MC4
Included Connectors 18
Euro Efficiency 98 %
Transformer None
MPPT Quantity 0
Has Integrated DC Switch Yes
Warranty 12 years

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare

Net Orders Checkout

Item Price Qty Total
Subtotal £0.00
Shipping
Total

Shipping Address

Shipping Methods

<
Part No: SE-90000-BASE-FULLInverters - Main Units
  • Rating: 90,000W
Description

Three Phase Synergy Inverter

Main Features:

  • Pre-commissioning feature for automated validation of system components and wiring during the site installation process and prior to grid connection.
  • Easy 2-person installation with lightweight, modular design (each inverter consists of 2 or 3 Synergy Units and one Synergy Manager).
  • Independent operation of each Synergy Unit enables higher uptime and easy serviceability.
  • Built-in thermal sensors detect faulty wiring ensuring enhanced protection and safety.
  • Built-in arc fault protection and optional rapid shutdown (depending on Synergy Manager used)
  • Built-in PID mitigation for maximized system performance.
  • Monitored‚and field-replaceable surge protection devices: integrated RS485 and Type 2 DC SPDs, optional Type 2 AC SPD.
Spec
Parameter Value
Weight 114 kg
Rated Power 90,000 W
Min PPT Voltage 0 V
Max PPT Voltage 0 V
DC Startup Voltage 0 V
DC Shutdown Voltage 0 V
Max Input Voltage 1,000 V
Max DC Power 0 W
Max AC Power (5 Minutes) 82,800 W
Surge AC Power (1 Second) 82,800 W
Max DC Current 0 A
Max DC Inputs 9
Has DC Fuses 0
Connector MC4
Included Connectors 18
Euro Efficiency 98 %
Transformer None
MPPT Quantity 0
Has Integrated DC Switch Yes
Warranty 12 years